Search User Login Menu
Tools
Close

dens
/ Categories: Lelang

Pengoperasian Dan Pemeliharaan- Pembersihan Pipa Penyalur

PT. Pertamina Hulu Mahakam

Prakualifikasi No. PQPS000481-TVR
IN-LINE INSPECTION SERVICES PACKAGE A, B & C

Register Date:
04-Sep-2019 07:30 WIB Until 13-Sep-2019 17:30 WIB

Minimum LC / TKDN Requirement (%):
Required ( 40.00% )

Minimum HSE Score of JRA Risk:
60.00

Tender Type:
Service with contract duration start from 01-Dec-2019 to 30-Nov-2022

Eligible for Agent/Manufacture:
No

Qualification:
Usaha Besar

Classification:
02.i.02.01. - PENGOPERASIAN DAN PEMELIHARAAN - PEMBERSIHAN PIPA PENYALUR - Conventional Pigging; 02.i.02.02. - PENGOPERASIAN DAN PEMELIHARAAN - PEMBERSIHAN PIPA PENYALUR - Crawling Pigging; 02.j.02.17. - INSPEKSI TEKNIS - VOLUNTARY - Intelligent Pigging;

Description:
IN-LINE INSPECTION SERVICES PACKAGE A, B & C TKDN Minimum Requirement is 40% Expected Commencement Date: 01 December 2019 Operational Duration : 3 years HSE Risk Level : High Risk Technical contact person : Hendri Eko Direct line : (0542)532363


Note:

"For MANUAL registration please submit the following documents then continue applying for SKTPM account in Procurement Committee website"

a.        Copy of valid SPDA certificate

b.        Copy of valid SKTPM certificate

c.      Copy of highest value of completed single PO/Contract related to the classification for last 7 years

 

Brief Description :

Service :

1. COMPANY requires CONTRACTOR to perform pipeline inspection using 1 (one) or more below method of  ILI service :

-          Magnetic Flux Leakage (MFL) ILI Method,

-          Ultrasonic Transducer (UT) ILI Method.

-          Advance ILI Method using Eddy Current Technology or equivalent

2. CONTRACTOR shall supply all labor, supervision, materials, EQUIPMENT, analytical skills and any other facilities required to conduct ILI Inspection of the pipelines

3. CONTRACTOR shall be responsible for the Tools Mobilization and Demobilizations of all their EQUIPMENT and PERSONNEL, from ILI Tools point of origin to CONTRACTOR base in Balikpapan and vise versa including but not limited to custom clearance, import/re-export permit and duty tax for EQUIPMENT, formalities for PERSONNEL (expatriates).

Previous Article Kurs Rupiah Sampai Akhir Tahun Diramal Tak Tembus Rp15.000/USD
Next Article PLN Gelontorkan Rp12 Triliun Bangun Tiga PLTU dan Satu Gardu Induk
Print
30 Rate this article:
No rating

Please login or register to post comments.

Back To Top